C-Bus, Schedule Plus Ver. 5 software license dongle, unlimited C-Bus, networks

Home ProductsSmart Home SolutionsC-BusSchedule Plus Ver. 5 software license dongle

C-Bus, Schedule Plus Ver. 5 software license dongle, unlimited C-Bus, networks

Item Number: 5000SDSPU/5

Datasheet

Barcode

Qty UoM EAN Colour
-
-
-

Specifications

Design

Range of product

C-Bus

Range

C-Bus

Product brand

Clipsal

Product or component type

software

Device application

monitoring|scheduling|control

Sustainable offer status

Green Premium product

Physical

Reach regulation

Reference contains Substances of Very High Concern above the threshold

Eu rohs directive

Compliant with Exemptions

Mercury free

Yes

Rohs exemption information

Yes

China rohs regulation

X

Environmental disclosure

ENVPEP1701009EN

Circularity profile

ENVEOLI1701009EN

Others

Package 1 bare product quantity

1

User language

English

Operating system

Windows

Unit type of package 1

PCE

Number of units in package 1

1

Package 1 height

6.3 cm

Package 1 width

13.4 cm

Package 1 length

15.9 cm

Package 1 weight

98 g

Unit type of package 2

CAR

Number of units in package 2

5

Package 2 height

15 cm

Package 2 width

22.5 cm

Package 2 length

35 cm

Package 2 weight

0.82 kg
Show all specifications

Frequently Asked Questions

hide show

How do we plug a C-BUS USB dongle on a server with out a USB port?

This applies to a Headend PC that doesn’t have a USB port i.e a virtual machine that's running Homegate or Schedule Plus

The solution is to use a Network-Attached USB Hub

Please see link below for Network-Attached USB Hubs

https://www.digi.com/products/usb-and-serial-connectivity/usb-over-ip-hubs/anywhereusb

https://www.cnet.com/au/products/belkin-network-usb-hub/review/

How to troubleshoot Schedule Plus hanging or crashing regularly?

If Schedule Plus is hanging or crashing regularly even after a system reboot, please check the following

1) Check the following files to ensure that PCI Polling has been disabled

IMPORTANT: Please backup C-Gate Configuration and C-Bus Toolkit Database files prior to any changes in case of corruption. Also use Notepad to edit/save the recommended changes to avoid formatting issues. The path shown below is based on the default C-Gate installation paths. 

Edit the following files using Notepad and use Ctrl + F to search for poll-interval - where found please change the parameter from default 60 to the disabled state 0 value. Note ProjectName relates to the site specific C-Bus Toolkit XML project
C:\Clipsal\C-Gate2\config\C-GateConfig.txt
C:\Clipsal\C-Gate2\tag\{ProjectName.XML}

Upon changing and saving these 2 files a reboot of the C-Gate service and Schedule Plus program will be required or a system reboot to bring changes into effect. 

2) Determine if the C-Bus Networks are being commissioned
Discuss with your integrator or facilities manager if there are C-Bus Networks that are currently being worked on. 
(see recommendation for 2 & 3 below)

3) Determine if the C-Bus Networks are constantly going into a marginal state or an offline state, resyncing and coming back online
Open the Schedule Plus C-Bus Network Manager via Projects | C-Bus Networks and check the Auto Refresh option and click the Refresh Button. If the same network is often becoming marginal or going offline it may be an indication of a hardware issue with a gateway device eg Network Interface or Network Bridge device or other C-Bus units on the network. 
(see recommendation for 2 & 3 below)

In the event C-Bus Networks are being commissioned or are exhibiting hardware issues it is recommended to temporarily not open and not use the network(s) in question if the issue is causing site to constantly hang or crash
and re-enabled at a later date once the issues are resolved on site.

Using the C-Bus Network Manager via Projects | C-Bus Network option 
Select the network in question by double left clicking on it and then changing the 
1) Use in Project to No and
2) Open When Connecting to C-Bus to No
and clicking OK to save changes
Then restarting C-Gate service and Schedule Plus program or rebooting the machine to bring those changes into effect.