EVlink Pro AC Charging station
Item Number: EVB3S22N4
Datasheet

For EVB3S22N4
Barcode
Qty | UoM | EAN | Colour |
---|---|---|---|
1 | 3606482213135 | - | |
- | |||
- |
Barcode
Qty | UoM | EAN | Colour |
---|---|---|---|
1 | 3606482213135 | - |
Specifications
Design
Range
Product or component type
Colour
- front face: white (RAL 9003)
- housing: dark grey (RAL 7016)
- back part: black (RAL 9005)
Physical
Communication network type
- Ethernet
- bluetooth
- 3G/4Gmodem optional
- Modbus TCP
Connector type
Communication port protocol
Function available
- diagnosis capabilities
- charge detail records
- load management
Range compatibility
- EVlink EcoStruxure EV Charging Expert
- EVlink EVlink Pro AC Metal
- EcoStruxure EcoStruxure EV Advisor
Type of installation
- indoor
- outdoor
Provided equipment
- 1 residual direct current detection device (RDC-DD) integrated
- 1 MNx auxiliary contact integrated
Mounting mode
- wall-mounted
- wall-mounted (kit enclosure)
- floor-standing (pedestal)
- floor-standing (kit enclosure)
Mounting support
- pedestal, to be ordered separately
- kit enclosure, to be ordered separately
Cable entry
- bottom entry
- top entry
- rear entry
Socket number
Control type
Local signalling
- 1 green LED light strip, function: available
- 1 blue LED light strip, function: charging
- 1 red LED light strip, function: fault indication
Standards
- EN/IEC 61851-1:ed. 3
- EN/IEC 62196-1:ed. 2
- EN/IEC 62196-2:ed. 1
- EN 61000-6-2:2019
- EN 61000-6-3:2007
- EN 61000-6-3:2011/A1
- IEC 60884-1
- NF C 61314
- ISO 15118
Product certifications
- EV Ready
- CE
Height
Width
Depth
Net weight
Ip degree of protection
Ik degree of protection
Ambient air temperature for operation
Ambient air temperature for storage
Relative humidity
Reach regulation
Eu rohs directive
Mercury free
China rohs regulation
Rohs exemption information
Environmental disclosure
Circularity profile
Others
Package 1 bare product quantity
Package 2 bare product quantity
Packaging made with recycled cardboard
Packaging without single use plastic
Product name
Device short name
Communication service
Operating mode
- clustered architecture
- standalone
Accuracy class
Protection device type
Poles description
[us] rated supply voltage
Nominal output power
Output type
Access control system
- badge RFID conforming to ISO/IEC 14443 A and B
- badge RFID conforming to ISO/IEC 15693
- badge NFC
- free access
Technology type
- MIFARE Classic
- MIFARE Ultralight
- MIFARE Plus
Rfid frequency
Nfc tag type
- type 1
- type 2
- type 4
- type 5
Earthing system
- TT
- TN-S
- TN-C-S
- IT (single phase network only allowed, 400V 3 phases network forbidden)
Condition of use
Number of inputs
Input type
- binary for power limitation closing contact
- binary for delayed charging closing contact
- binary for vehicle detection closing contact
Operating altitude
Unit type of package 1
Number of units in package 1
Package 1 height
Package 1 width
Package 1 length
Package 1 weight
Unit type of package 2
Number of units in package 2
Package 2 height
Package 2 width
Package 2 length
Package 2 weight
Green premium status for reporting
Product contributes to saved and avoided emissions
Carbon footprint (kg.eq.co2 per cr, total life cycle)
Global warming ; total life cycle
Documents & downloads
hide show-
All
-
Product Brochures
-
CAD Files and Packs
-
Technical Data Catalogues
-
Other technical guide
-
Installation Instruction
-
End of Life Manual
-
Environmental Disclosure
-
System User Guide
-
Operating Manuals
-
Technical illustration
-
Technical Drawing
-
Application Notes
-
Certificates (MSDS)
-
Declaration of Conformity
-
Firmware
EVlink Pro AC
VERSION
1.1
DATE
09 Sep 2024
REVISION
1.1
EVlink Commissioning Service - Brochure
VERSION
1.1
DATE
04 Oct 2023
REVISION
1.1
EVlink Parking Substitution Guide
VERSION
1.0
DATE
14 Aug 2023
REVISION
1.0
EVlink Smart Wallbox Substitution Guide
VERSION
1.0
DATE
20 Jul 2023
REVISION
1.0
EVlink Pro AC Metal, the next generation of charging stations for electric vehicles
VERSION
1.0
DATE
20 Jul 2023
REVISION
1.0
EVlink Pro AC Metal - Brochure
VERSION
1.3
DATE
25 Apr 2023
REVISION
1.3
EVlink Pro AC - Brochure
VERSION
1.3
DATE
28 Mar 2023
REVISION
1.3
CAD - EVlink Pro AC Chargers T2S
VERSION
1.0
DATE
01 Aug 2024
REVISION
1.0
eMobility Solutions - Catalog 2025
VERSION
5.0
DATE
07 Feb 2025
REVISION
5.0
EVlink Pro AC - Modbus Connectivity Guide
VERSION
1.8
DATE
07 Jan 2025
REVISION
1.8
EVlink Pro AC - Cybersecurity Guide
VERSION
1.3
DATE
07 Jan 2025
REVISION
1.3
EVlink Pro AC - OCPP Protocol Connectivity Guide
VERSION
1.8
DATE
07 Jan 2025
REVISION
1.8
EVlink Pro AC Ring Topology commissioning guide
VERSION
1.0
DATE
11 Sep 2024
REVISION
1.0
EVlink Pro AC - Spare Part Replacement Guide
VERSION
1.0
DATE
04 Feb 2025
REVISION
1.0
EVlink Pro AC - Installation Guide
VERSION
2.1
DATE
07 Oct 2024
REVISION
2.1
EVlink Pro AC - Spare part replacement guide for standards
VERSION
1.0
DATE
04 Aug 2023
REVISION
1.0
EVlink AC charger 3.7kw 16A 1PH T2S SOCKET 6mA RCD Type A MNX
VERSION
2.0
DATE
20 Jan 2025
REVISION
2.0
EVlink AC charger 3.7kw 16A 1PH T2S SOCKET 6mA RCD Type A MNX
VERSION
2.0
DATE
20 Jan 2025
REVISION
2.0
eMobility Infrastructure Design Guide for Building Applications
VERSION
2.0
DATE
24 Jan 2025
REVISION
2.0
EVlink Pro AC Charging Infrastructure, Preventive Maintenance Guide
VERSION
1.0
DATE
03 Dec 2024
REVISION
1.0
Troubleshooting Guide, EVlink Pro AC Charging Stations
VERSION
1.0
DATE
07 Aug 2024
REVISION
1.0

Buildings Application - Architecture illustration of an EV infrastructure for Office Buildings
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0

Buildings Application - Architecture illustration for a Depot with AC and Fast DC chargers
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0

Buildings Application - Architecture illustration of an EV solution for Car Parks
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0

Buildings Application - Architecture illustration for EV charging infrastructure in residential buildings application
VERSION
1.0
DATE
07 Feb 2025
REVISION
1.0

EVlink Pro AC - 2D Dimensions
VERSION
1.0
DATE
01 Aug 2024
REVISION
1.0
EVlink Pro AC Front Plate Drawing with Logo - Plan for Customization
VERSION
1.0
DATE
04 Oct 2023
REVISION
1.0
EVlink Pro AC Front Plate Drawing Without Logo - Plan for Customization
VERSION
1.0
DATE
04 Oct 2023
REVISION
1.0
eMobility Solution for Single Tertiary Sites - Application Note
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0
eMobility Solution for Charging infrastructure at work - Multisite - Application Note
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0
eMobility Solution for Car Parks - Application Note
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0
eMobility solution for Light Commercial Electrical Vehicle Depots - Application Note
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0
EVlink Pro AC, EVB3 series, IEC CB Test Certificate
VERSION
1.1
DATE
27 Mar 2024
REVISION
1.1
EVlink Pro AC, E.V. READY Listed Product, Certificate of conformity
VERSION
1.0
DATE
23 Mar 2023
REVISION
1.0
EVlink Pro AC, EBV3 series, EU Declaration of Conformity
VERSION
1.0
DATE
23 May 2023
REVISION
1.0
EVlink Pro AC, EBV3 series, UK Declaration of Conformity
VERSION
1.0
DATE
28 Mar 2023
REVISION
1.0
EVlink Pro AC
VERSION
1.1
DATE
09 Sep 2024
REVISION
1.1
EVlink Commissioning Service - Brochure
VERSION
1.1
DATE
04 Oct 2023
REVISION
1.1
EVlink Parking Substitution Guide
VERSION
1.0
DATE
14 Aug 2023
REVISION
1.0
EVlink Smart Wallbox Substitution Guide
VERSION
1.0
DATE
20 Jul 2023
REVISION
1.0
EVlink Pro AC Metal, the next generation of charging stations for electric vehicles
VERSION
1.0
DATE
20 Jul 2023
REVISION
1.0
EVlink Pro AC Metal - Brochure
VERSION
1.3
DATE
25 Apr 2023
REVISION
1.3
EVlink Pro AC - Brochure
VERSION
1.3
DATE
28 Mar 2023
REVISION
1.3
CAD - EVlink Pro AC Chargers T2S
VERSION
1.0
DATE
01 Aug 2024
REVISION
1.0
eMobility Solutions - Catalog 2025
VERSION
5.0
DATE
07 Feb 2025
REVISION
5.0
EVlink Pro AC - Modbus Connectivity Guide
VERSION
1.8
DATE
07 Jan 2025
REVISION
1.8
EVlink Pro AC - Cybersecurity Guide
VERSION
1.3
DATE
07 Jan 2025
REVISION
1.3
EVlink Pro AC - OCPP Protocol Connectivity Guide
VERSION
1.8
DATE
07 Jan 2025
REVISION
1.8
EVlink Pro AC Ring Topology commissioning guide
VERSION
1.0
DATE
11 Sep 2024
REVISION
1.0
EVlink Pro AC - Spare Part Replacement Guide
VERSION
1.0
DATE
04 Feb 2025
REVISION
1.0
EVlink Pro AC - Installation Guide
VERSION
2.1
DATE
07 Oct 2024
REVISION
2.1
EVlink Pro AC - Spare part replacement guide for standards
VERSION
1.0
DATE
04 Aug 2023
REVISION
1.0
EVlink AC charger 3.7kw 16A 1PH T2S SOCKET 6mA RCD Type A MNX
VERSION
2.0
DATE
20 Jan 2025
REVISION
2.0
EVlink AC charger 3.7kw 16A 1PH T2S SOCKET 6mA RCD Type A MNX
VERSION
2.0
DATE
20 Jan 2025
REVISION
2.0
eMobility Infrastructure Design Guide for Building Applications
VERSION
2.0
DATE
24 Jan 2025
REVISION
2.0
EVlink Pro AC Charging Infrastructure, Preventive Maintenance Guide
VERSION
1.0
DATE
03 Dec 2024
REVISION
1.0
Troubleshooting Guide, EVlink Pro AC Charging Stations
VERSION
1.0
DATE
07 Aug 2024
REVISION
1.0

Buildings Application - Architecture illustration of an EV infrastructure for Office Buildings
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0

Buildings Application - Architecture illustration for a Depot with AC and Fast DC chargers
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0

Buildings Application - Architecture illustration of an EV solution for Car Parks
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0

Buildings Application - Architecture illustration for EV charging infrastructure in residential buildings application
VERSION
1.0
DATE
07 Feb 2025
REVISION
1.0

EVlink Pro AC - 2D Dimensions
VERSION
1.0
DATE
01 Aug 2024
REVISION
1.0
EVlink Pro AC Front Plate Drawing with Logo - Plan for Customization
VERSION
1.0
DATE
04 Oct 2023
REVISION
1.0
EVlink Pro AC Front Plate Drawing Without Logo - Plan for Customization
VERSION
1.0
DATE
04 Oct 2023
REVISION
1.0
eMobility Solution for Single Tertiary Sites - Application Note
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0
eMobility Solution for Charging infrastructure at work - Multisite - Application Note
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0
eMobility Solution for Car Parks - Application Note
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0
eMobility solution for Light Commercial Electrical Vehicle Depots - Application Note
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0
EVlink Pro AC, EVB3 series, IEC CB Test Certificate
VERSION
1.1
DATE
27 Mar 2024
REVISION
1.1
EVlink Pro AC, E.V. READY Listed Product, Certificate of conformity
VERSION
1.0
DATE
23 Mar 2023
REVISION
1.0
EVlink Pro AC, EBV3 series, EU Declaration of Conformity
VERSION
1.0
DATE
23 May 2023
REVISION
1.0
EVlink Pro AC, EBV3 series, UK Declaration of Conformity
VERSION
1.0
DATE
28 Mar 2023
REVISION
1.0
- Page 1 / 7
- Page 2 / 7
- Page 3 / 7
- Page 4 / 7
- Page 5 / 7
- Page 6 / 7
- Page 7 / 7
EVlink Pro AC
VERSION
1.1
DATE
09 Sep 2024
REVISION
1.1
EVlink Commissioning Service - Brochure
VERSION
1.1
DATE
04 Oct 2023
REVISION
1.1
EVlink Parking Substitution Guide
VERSION
1.0
DATE
14 Aug 2023
REVISION
1.0
EVlink Smart Wallbox Substitution Guide
VERSION
1.0
DATE
20 Jul 2023
REVISION
1.0
EVlink Pro AC Metal, the next generation of charging stations for electric vehicles
VERSION
1.0
DATE
20 Jul 2023
REVISION
1.0
EVlink Pro AC Metal - Brochure
VERSION
1.3
DATE
25 Apr 2023
REVISION
1.3
EVlink Pro AC - Modbus Connectivity Guide
VERSION
1.8
DATE
07 Jan 2025
REVISION
1.8
EVlink Pro AC - Cybersecurity Guide
VERSION
1.3
DATE
07 Jan 2025
REVISION
1.3
EVlink Pro AC - OCPP Protocol Connectivity Guide
VERSION
1.8
DATE
07 Jan 2025
REVISION
1.8
EVlink Pro AC Ring Topology commissioning guide
VERSION
1.0
DATE
11 Sep 2024
REVISION
1.0
EVlink Pro AC - Spare Part Replacement Guide
VERSION
1.0
DATE
04 Feb 2025
REVISION
1.0
EVlink Pro AC - Installation Guide
VERSION
2.1
DATE
07 Oct 2024
REVISION
2.1
EVlink Pro AC - Spare part replacement guide for standards
VERSION
1.0
DATE
04 Aug 2023
REVISION
1.0

Buildings Application - Architecture illustration of an EV infrastructure for Office Buildings
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0

Buildings Application - Architecture illustration for a Depot with AC and Fast DC chargers
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0

Buildings Application - Architecture illustration of an EV solution for Car Parks
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0

Buildings Application - Architecture illustration for EV charging infrastructure in residential buildings application
VERSION
1.0
DATE
07 Feb 2025
REVISION
1.0

EVlink Pro AC - 2D Dimensions
VERSION
1.0
DATE
01 Aug 2024
REVISION
1.0
eMobility Solution for Single Tertiary Sites - Application Note
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0
eMobility Solution for Charging infrastructure at work - Multisite - Application Note
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0
eMobility Solution for Car Parks - Application Note
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0
eMobility solution for Light Commercial Electrical Vehicle Depots - Application Note
VERSION
1.0
DATE
17 Feb 2025
REVISION
1.0
Related products

DISCONTINUED
13979
Mureva Enclosure, Weatherproof enclosure for modular device, 1x12 modules, 7 pre-cutouts, without terminal block
1x12 modules, 7 pre-cutouts, without terminal block
Recently viewed

DISCONTINUED
EVB3S22N4
EVlink Pro AC, Charging station, AC Metal, 22kW, 32A, 3P+N, T2S socket-outlet, RDC-DD 6mA, MNx aux.
AC Metal, 22kW, 32A, 3P+N, T2S socket-outlet, RDC-DD 6mA, MNx aux.